Blog
Notes on the documents fire engineers write, and the questions design teams ask about them. For the main stages, see planning fire statements, Gateway 2 and fees.
DrawingsWhat Fire Strategy Drawings Show, and When Building Control Asks
Fire strategy drawings mark escape routes, compartments, fire doors and fire service access on the plans. What goes on them and when they are asked for.
21 November 2026
- Planning
London Plan Fire Statements: Which Schemes Need One?
A London Plan fire statement under Policy D12 covers far more schemes than the national Gateway One rule. Which ones need one and what goes in it.
19 November 2026
- Handover
What Fire Information Goes Into the Golden Thread
The golden thread for higher-risk buildings holds the fire information the building needs for life. What goes in from the fire strategy, and when.
18 November 2026
- Planning
Does Your Scheme Need a Planning Gateway One Fire Statement?
Planning Gateway One applies to planning applications for tall residential buildings. How height is measured, what is exempt and what happens next.
16 November 2026
- Existing buildings
Fire Strategy or Fire Risk Assessment: Which Is Being Asked For?
Fire strategy vs fire risk assessment: one is written for the design and approval of a building, the other for a building in use. Which one you need.
14 November 2026
Need a strategy written for your scheme?
Get a quote