In one paragraph
London Plan Policy D12 asks for a fire statement with all major development proposals in London, not only tall residential buildings. It sits alongside the national Planning Gateway One form, and many London schemes need to satisfy both.
London had its own fire statement policy before the national one arrived. If your scheme is in a London borough, there is a good chance it needs a fire statement even when it is nowhere near 18 metres.
Two rules, one site
The national rule, Planning Gateway One, applies across England. A full planning application for a building of 18 metres or 7 storeys and over, with two or more homes or student rooms, must include a fire statement on the government’s form. The gov.uk guidance sets out which applications are covered.
The London rule is Policy D12 of the London Plan. It asks for a fire statement with all major development proposals, prepared by a suitably qualified third party. Major development includes ten or more homes or 1,000 square metres of new floor space, so a five-storey block of flats or a mid-sized office scheme can be caught. The Greater London Authority’s Fire Safety guidance explains what boroughs expect.
What a D12 statement covers
The London statement looks at the same ground as the national form, and a little more:
- How the building is built, and the fire performance of its materials
- How residents and staff escape, including people who need help
- The evacuation lift, where London Plan policy on accessible housing asks for one
- Fire service access, the appliance position and the water supply
- How the fire safety measures will be managed and maintained once the building is in use
- How future changes to the building will keep the strategy intact
Can one document do both jobs?
Often, yes. For a tall residential scheme in London, a fire engineer can complete the government form and add the extra London material in an appendix, or write one statement that clearly covers both. What matters is that the borough’s validation checklist is met, so read it before the engineer starts.
Who should write it
Policy D12 asks for a third party who is suitably qualified, which in practice means a fire engineer rather than the architect. Most boroughs want to see the author’s qualifications on the front page. The work feeds straight into the later fire strategy report, so using the same engineer for both saves time.
Our planning fire statement page covers the national form in more detail, and the cost guide has typical fees.