Written by fire engineers for planning, Building Regulations and, on higher-risk buildings, the Gateway 2 application.

Get a quote
Cranes over a city building site

Where the law asks for a fire strategy

England only. The rules page goes through each case in full.

Statutory basis
Building work has to meet Part B of the Building Regulations 2010: means of escape, fire spread inside and out, and access for firefighters. Approved Document B is the official guidance on how to meet it. Source: Approved Document B, gov.uk
Point in the project
With the building regulations application, before work starts. For a higher-risk building the Building Safety Regulator must approve it first, and a full planning application for a tall residential scheme needs a fire statement. Source: Building control for higher-risk buildings, gov.uk
Document produced
A written fire strategy report, usually with marked-up plans. At completion the fire safety information goes to the building owner under Regulation 38. Source: Building Regulations 2010, regulation 38

What goes into a fire strategy report

The engineer takes the drawings and explains, floor by floor, how people escape, how far they walk to a protected stair, where the fire-resisting walls and doors go, what sprinklers, alarms and smoke control the building has, and how a fire crew reaches every part of it.

Most reports follow the published guidance: Approved Document B for simpler buildings, BS 9991 for homes and BS 9999 for most others. Where the design does something the guidance doesn't allow, such as a longer travel distance or a single stair, the engineer has to show by calculation that it is still safe. That engineered route takes longer and costs more.

Marked-up fire strategy drawings usually come with it, and building control will want them.

By our estimate, a strategy for an ordinary building regulations application costs £2,500 to £5,000 plus VAT. See fire strategy report cost or the fee calculator.

From enquiry to a written fee

Four steps from first message to a fixed fee.

  1. Tell us the site

    The postcode and how to reach you. Nothing about the building yet.

  2. We name an engineer

    One fire engineer who covers the area and the building type.

  3. They read the drawings

    Plans, sections and the use of each floor. A call clears up the rest.

  4. A written fee

    A fixed fee for the report, with any modelling, survey or meetings priced as separate lines.

How matching works

Questions to put to an engineer first

The title "fire engineer" isn't protected, so anyone can use it. For Gateway 2 work in particular, look for registration through the Engineering Council and a track record with the regulator.

Building control approval for new higher-risk buildings took a median of 23 weeks in the July to September 2026 figures, against the 12 weeks set out in the guidance. A strategy that answers the regulator's questions first time is worth paying for. See the Gateway 2 waiting times study and our page on choosing a fire engineer.

  • Are you a member of the Institution of Fire Engineers, and are you chartered (CEng) or incorporated (IEng)?
  • Have you had a strategy approved at Gateway 2, and how many came back with questions?
  • Will you follow Approved Document B, BS 9991 or BS 9999, or engineer parts of the design?
  • What professional indemnity cover do you carry, and does it suit a scheme of this size?
  • How many rounds of comments from building control does the fee include?

What clients and architects ask us

What is a fire strategy report?

A document written by a fire engineer that sets out how a building keeps people safe in a fire: how they get out, how fire and smoke are held back, what the alarm and detection do, and how firefighters get in. Building control reads it against Approved Document B or the British Standard the design follows.

Is a fire strategy report a legal requirement?

The law requires the building to meet Part B of the Building Regulations, not a document with that name. In practice building control asks for a strategy on almost anything beyond a simple house extension, and for higher-risk buildings the Building Safety Regulator expects one in the Gateway 2 application. Our page on when a fire strategy is required sets out each case.

Is it the same as a fire risk assessment?

No. A strategy is written for the design of the building and is used to get it approved. A fire risk assessment is carried out on a building in use, by or for the person responsible for it under the Fire Safety Order. The assessment leans on the strategy, which is why a missing one often leads to a retrospective strategy.

How long does a fire strategy take to write?

Firms publishing turnaround times quote one to three weeks from a full set of drawings for an ordinary building. Engineered designs with smoke or evacuation modelling take longer, and so do higher-risk buildings, where the regulator often asks questions.

Who should commission it?

The client, usually the developer or building owner, or the architect or principal designer on their behalf. For a higher-risk building the client is legally responsible for the Gateway 2 application even when an agent sends it in.

Where these figures come from

Fire strategy quotes for your project

Tell us where the site is and how to reach you. An engineer will ask about the building and the drawings when they call.

We look for one fire engineer suited to the scheme. You'll know who they are before they hear anything about you, and there's no charge from us.

Worth having to hand: the address, the use, the number of storeys and whichever drawings you hold.

The site and how to reach you
Get a quote