Fire Strategy Report Cost
Typical fees for each kind of fire strategy work, a calculator, and what makes one quote higher than another. Every figure is our own estimate.
Typical: a building regulations strategy
£2,500 to £5,000
Low: the cheapest published "from" fee
£850
High: an engineered higher-risk building
£20,000+
Prices as of November 2026. Add VAT to each one; all are our own estimates built from fees UK fire engineers publish.
Fees by type of work
| Type of work | When it is asked for | Typical fee |
|---|---|---|
| Planning fire statement | The form that goes in with a full planning application for a relevant building. | £1,000 to £3,000 |
| Strategy for a building regulations application | Ordinary buildings under 18 metres going through a local authority or registered building control approver. | £2,500 to £5,000 |
| Retrospective strategy for an existing building | A simple occupied building with no strategy on file, before a change or a sale. | £1,500 to £3,000 |
| Gateway 2 strategy for a higher-risk building | Blocks of 18 metres or 7 storeys and over with two or more homes, and hospitals and care homes of that height. | £5,000 to £20,000 |
Fees by size of building
For a building regulations strategy following standard guidance, with full drawings. These come from the calculator's assumptions, set out below it.
| Gross internal floor area | Guide fee |
|---|---|
| Under 500 m² | £2,150 to £4,250 |
| 500 to 2,000 m² | £2,500 to £5,000 |
| 2,000 to 10,000 m² | £3,400 to £6,750 |
| Over 10,000 m² | £4,500 to £9,000 |
Fire strategy fee calculator
Four questions. The answer is a guide range, ex VAT, rounded to the nearest £50.
Guide fee
£2,500 to £5,000
Plus VAT. Modelling scenarios, extra meetings and building control query rounds are often priced separately.
How the calculator works. Each type of work starts from the published fee band in the first table. Floor area multiplies it by 0.85 (under 500 m²), 1, 1.35 or 1.8 (over 10,000 m²). Some engineered parts add a quarter; a fully engineered design adds 60%. Missing drawings add a survey, using the published £500 to £1,200 band. The multipliers are our own estimate of how fees scale, not a published rate.
Three results worked by hand
| Project | Calculator result |
|---|---|
| Strategy for a 1,200 m² office refit, standard guidance, full drawings | £2,500 to £5,000 |
| Retrospective strategy for a small HMO, no drawings | £1,800 to £3,750 |
| Gateway 2 strategy for a 6,000 m² block, some engineered parts | £8,450 to £33,750 |
What makes one fee higher than another
The biggest single factor is whether the design follows the published guidance or departs from it. A building that meets Approved Document B, BS 9991 or BS 9999 can be described and checked against tables. One that doesn't, such as a long single-stair corridor or an atrium, needs the engineer to prove it is safe with calculation and often computer modelling, and each modelled scenario takes days.
Height comes next. Once a residential building reaches 18 metres or 7 storeys, the Gateway 2 process brings detailed questions from the regulator and usually more than one revision of the report.
- Standard guidance or an engineered design
- Height, storeys and whether the building is higher-risk
- Floor area and the number of different uses
- Whether current drawings exist or a survey is needed
- Smoke or evacuation modelling, priced per scenario
- Rounds of comments and meetings with building control
- The seniority of the engineer the job needs
Questions about fire engineering fees
How much does a fire strategy report cost?
For an ordinary building going through building regulations, our estimate from published UK fees runs between £2,500 and £5,000 plus VAT. A planning fire statement can cost less, and a strategy for a higher-risk building usually costs several times more.
Why do two engineers quote such different fees?
Usually because they have priced different things. One may include two rounds of comments from building control, marked-up drawings and a site visit; another may price the report alone and charge for each extra. Ask each to list what is in and what is out.
Is VAT added?
Almost always. Fire engineering firms are VAT registered, so add 20% to the fees on this page unless the quote says otherwise.
Can I get a fixed fee?
Most engineers will fix the fee for the report once they have seen the drawings. Modelling, surveys and extra meetings are often priced as separate lines. Our guide to choosing a fire engineer lists the questions to ask.
Get a written fee for your project
The calculator gives a range. An engineer who has seen the drawings gives a fixed figure.
We look for one fire engineer suited to the scheme. You'll know who they are before they hear anything about you, and there's no charge from us.
Worth having to hand: the address, the use, the number of storeys and whichever drawings you hold.
Enquiry received
- An engineer matched to the site and building type is emailed to you by name.
- Reply yes and your details go to them; reply no and the enquiry closes.
- The engineer calls, asks for the drawings and sends a written fee.