Retrospective Fire Strategy

For a building already in use with no strategy on file, before a change of use, a refurbishment or a sale.

Get a quote

Existing buildings and the fire rules

Statutory basis
The Regulatory Reform (Fire Safety) Order 2005 for a building in use; Part B of the Building Regulations 2010 for any change made to it. Source: SI 2005/1541, legislation.gov.uk
Point in the project
There is no fixed cycle. It is written when no strategy exists and one is asked for: by the fire risk assessor, an insurer, a buyer, or building control before a change of use. Source: Building Regulations 2010, legislation.gov.uk
Document produced
A report describing how the building as it stands protects people in a fire, with marked-up plans and a list of anything that falls short of current guidance. Source: Approved Document B, gov.uk

In brief

The engineer visits, works out how the building was meant to behave in a fire, and writes it down. For a simple building, fees start around £1,500; add a survey if there are no plans.

When one is asked for

Plenty of buildings were built or converted without a written strategy, or had one that disappeared with the developer. Nobody misses it until one of these happens:

  • A fire risk assessor can't tell how the compartments, stairs and alarm were meant to work
  • An insurer or lender asks for it at renewal or on a sale
  • The owner plans a change of use, such as offices to flats, or an extension that touches the escape routes
  • A new managing agent takes over a block and finds nothing in the handover files
  • The fire and rescue service has raised a concern after an inspection

What the engineer does on site

A retrospective strategy starts from what is really there. The engineer walks the escape routes, measures travel distances, looks at the stairs and lobbies, checks which walls and doors are meant to resist fire, notes the alarm and emergency lighting, and opens up where the drawings don't match. If there are no drawings at all, plans have to be drawn first, and visual surveys of compartmentation are priced at about £500 to £1,200 on top of the report.

The report then compares the building with current guidance. Where it falls short, the engineer says how much it matters and what could fix it. That list is what the owner and the fire risk assessor work from.

Change of use and conversions

A change of use is the most common reason for a retrospective strategy, because building control treats the converted building as new for fire purposes. Offices becoming flats, a house becoming an HMO, or a shop gaining homes above all bring tighter rules on escape and separation. The strategy shows building control the starting point and the changes needed to reach the standard. For tall blocks the regulator, not building control, approves the work: see Gateway 2.

Fees for a retrospective strategy

Our estimate from published UK fees puts a retrospective strategy for a simple existing building at about £1,500 to £3,000 plus VAT. Large or complex buildings, intrusive surveys and buildings with several uses cost more. The cost page has the full ranges and a calculator.

Questions from building owners

Why would an existing building need a fire strategy?

Usually because someone has asked for one and it can't be found. Fire risk assessors ask for it to understand how the building was designed to work, buyers' surveyors ask for it in due diligence, and building control needs a starting point before a change of use or an extension.

Will it make us do building work?

A retrospective strategy records what is there and how it compares with current guidance. It can recommend work, but it doesn't order any. Whether work is needed is for the responsible person to decide with the fire risk assessor, under the Fire Safety Order.

Is it different from a fire risk assessment?

Yes. The assessment looks at how the building is run day to day: fire doors propped open, rubbish in the stairs, training and testing. The strategy explains how the building itself is meant to work in a fire. Most assessors want to see both. Our article on the difference between the two goes further.

Quotes for a retrospective strategy

Tell us where the building is. The engineer will ask what it is used for and what records you have when they call.

We look for one fire engineer suited to the scheme. You'll know who they are before they hear anything about you, and there's no charge from us.

Worth having to hand: the address, the use, the number of storeys and whichever drawings you hold.