Planning Fire Statement

The first fire document a tall residential scheme needs. It goes in with the planning application, and the regulator reads it.

Get a quote

Fire statements under Planning Gateway One

Statutory basis
The Town and Country Planning (Development Management Procedure and Section 62A Applications) (England) (Amendment) Order 2021, known as Planning Gateway One. Source: SI 2021/746, legislation.gov.uk
Point in the project
Once, with a full planning application for a relevant building: 18 metres or 7 storeys and over, with two or more homes or student rooms. Source: Planning practice guidance, gov.uk
Document produced
A completed fire statement on the government form. The planning authority consults the Health and Safety Executive, through the Building Safety Regulator, before it decides. Source: Planning practice guidance, gov.uk

In brief

If the building will be 18 metres or 7 storeys and over with homes in it, a full planning application needs a fire statement on the government's form. Fees start at about £1,000 and run to £3,000 for most schemes.

Why planning asks about fire at all

Planning Gateway One started on 1 August 2021. Before then, fire safety was left almost entirely to building control, by which time the layout of a scheme was fixed. Some decisions that matter in a fire are made much earlier: where the fire engine parks, how far the hose has to reach, whether there's room for a second stair, and where the water supply is.

The fire statement puts those decisions in front of the planning authority and to the Health and Safety Executive, which the authority must consult before granting permission and which now does that work through the Building Safety Regulator. It is not a fire strategy, and it doesn't need the detail of one. It does need to be accurate, because it follows the scheme into Gateway 2.

What goes on the form

  • The site, the building, its height and storeys, and what each floor is used for
  • The fire safety design standards the scheme will follow
  • The materials planned for the external walls and balconies
  • How residents will evacuate, and the stairs, lifts and corridors that serve it
  • Access for fire appliances, the nearest hydrants and the water supply
  • Any fire safety point raised in pre-application discussions

London schemes

Policy D12 of the London Plan asks for a fire statement on a wider range of major developments, not only tall residential ones, and London boroughs apply it to their own validation lists. If the site is in London, ask the engineer which statement the borough wants, because one engineer can usually do both on the same form.

Fees for a fire statement

Our estimate, from fees UK fire engineers publish, puts a planning fire statement at about £1,000 to £3,000 plus VAT. The lower end suits a simple block with the layout already settled; the upper end covers mixed-use schemes, several buildings on one site, or a design that needs a fire engineering argument at planning stage. See the fee guide for the other stages.

Getting it right first time

The most common problems are statements that don't match the drawings, that leave the external wall materials vague, or that promise a single stair the regulator won't accept. Send the engineer the latest drawings and the design and access statement, and ask them to read the regulator's published comments on similar schemes. When the scheme moves on, read our page on the Gateway 2 strategy.

Fire statement questions from planning teams

Who can fill in a fire statement?

The guidance asks for someone suitably qualified and competent, and names no single qualification. In practice planning authorities and the regulator expect a fire engineer or fire safety specialist with experience of tall residential buildings, and a statement from anyone less qualified invites questions.

Do outline applications need one?

No. Outline applications and section 73 applications to vary conditions are exempt from the national rule. The gov.uk guidance lists the exemptions. London schemes may still need one under the London Plan.

Is the fire statement the same as the fire strategy?

No. The statement is a planning document that deals with matters that affect the layout and the land around the building. The Gateway 2 fire strategy comes later and goes much further into the detail. A good engineer writes the statement so the strategy can build on it.

What happens if the regulator objects?

The planning authority has to take its advice into account. An objection often means changes to the layout, such as a second stair or better fire service access, so it pays to settle those points before the application goes in.

Quotes for a fire statement

Tell us where the site is. The engineer will ask about the scheme and the planning programme when they call.

We look for one fire engineer suited to the scheme. You'll know who they are before they hear anything about you, and there's no charge from us.

Worth having to hand: the address, the use, the number of storeys and whichever drawings you hold.

The site and how to reach you