When a Fire Strategy Is Required
The rules in England that lead to a fire strategy, who has to act on them, and at which point in a project.
The rules on one card
- Statutory basis
- Part B of the Building Regulations 2010 (requirements B1 to B5), with the Building Safety Act 2022 adding the gateways for higher-risk buildings. Source: Building Regulations 2010, legislation.gov.uk
- Point in the project
- At each approval point: planning for tall residential schemes, building control before work starts, and completion. Source: Building control approval for higher-risk buildings, gov.uk
- Document produced
- A fire strategy report and drawings for approval, then a handover pack for the person who runs the building. Source: Regulation 38, legislation.gov.uk
Part B and Approved Document B
Every building project in England that counts as building work has to meet Part B of the Building Regulations 2010. Part B has five requirements: a way to escape (B1), limits on fire spreading across walls and ceilings inside (B2), structure and compartments that hold fire back (B3), limits on spread over the outside walls and between buildings (B4), and access and facilities for the fire service (B5).
The regulations don't say how to meet them. Approved Document B does, for common building types. A design that follows it closely is presumed to comply. Larger or unusual buildings follow the British Standards instead: BS 9991 for residential buildings, BS 9999 for most others, and the PD 7974 series when the engineer designs from first principles.
A fire strategy is how the design team shows building control which route it took and how each requirement is met. The law doesn't name it, but building control asks for one on almost every project beyond a simple house extension.
Higher-risk buildings
The Building Safety Act 2022 created a stricter regime for higher-risk buildings: in England, at least 18 metres or 7 storeys, with two or more homes, or a hospital or care home of that height. For these the Building Safety Regulator is the building control authority, and there are three gateways:
- Gateway 1, at planning: a fire statement with the full planning application. See planning fire statement.
- Gateway 2, before work starts: building control approval from the regulator, with a full fire strategy. See Gateway 2 fire strategy.
- Gateway 3, at completion: a completion certificate before anyone moves in. See Regulation 38 handover.
Who has to do what
| Who | What they must do |
|---|---|
| Client (developer or owner) | Commissions the strategy, makes the Gateway 2 and Gateway 3 applications for a higher-risk building, and is responsible for them even if an agent sends them. |
| Principal designer and design team | Make sure the design meets Part B; the fire engineer writes the strategy and the drawings that show how. |
| Person carrying out the work | Hands the fire safety information to the responsible person at completion or occupation under Regulation 38. |
| Responsible person | Keeps the building safe once it is in use, with a fire risk assessment under the Fire Safety Order that draws on the strategy. |
Regulation 38 at handover
Where the finished building will fall under the Fire Safety Order, Regulation 38 requires the person carrying out the work to pass on the fire safety information by the date of completion or occupation, whichever is first. A good pack contains:
- The as-built fire strategy and fire strategy drawings
- Fire-stopping and compartmentation records
- Alarm, detection, emergency lighting and smoke control certificates
- The fire door schedule
- Dry or wet riser and firefighting lift details
- Operating and maintenance manuals for each fire safety system
- A record of who received the pack and when
Buildings already in use
Once a building is occupied, the Regulatory Reform (Fire Safety) Order 2005 takes over. The responsible person must have a suitable and sufficient fire risk assessment. There is no duty to hold a fire strategy, but an assessor who can't see how the building was designed often asks for a retrospective strategy.
Official sources on this page
- The Building Regulations 2010 (legislation.gov.uk)
- Approved Document B: fire safety (gov.uk)
- Building Safety Planning Gateway One (gov.uk)
- Building control approval for higher-risk buildings (gov.uk)
- The Building (Higher-Risk Buildings Procedures) (England) Regulations 2023
- The Regulatory Reform (Fire Safety) Order 2005
Strategies at each stage
- Planning fire statementWhat it covers, what it costs and what the engineer needs.
- Gateway 2 fire strategyWhat it covers, what it costs and what the engineer needs.
- Retrospective fire strategyWhat it covers, what it costs and what the engineer needs.
- Regulation 38 handoverWhat it covers, what it costs and what the engineer needs.
Rule questions we hear most
Does a house extension need a fire strategy?
Rarely as a separate report. Building control checks a simple domestic extension against Approved Document B volume 1 using the plans. A loft conversion that adds a storey, or a house becoming flats or an HMO, may need one.
What is Approved Document B?
The government's guidance on how to meet Part B. Volume 1 covers houses and flats, volume 2 other buildings. Following it is one way to comply; a fire engineer can show compliance another way. It is free on gov.uk.
What changed with the Building Safety Act?
For higher-risk buildings the Building Safety Regulator became the building control authority, with approval needed before work starts and a completion certificate before people move in. See our Gateway 2 page.
Fire strategy quotes for your project
Tell us where the site is and how to reach you. An engineer will ask about the building and the drawings when they call.
We look for one fire engineer suited to the scheme. You'll know who they are before they hear anything about you, and there's no charge from us.
Worth having to hand: the address, the use, the number of storeys and whichever drawings you hold.
Enquiry received
- An engineer matched to the site and building type is emailed to you by name.
- Reply yes and your details go to them; reply no and the enquiry closes.
- The engineer calls, asks for the drawings and sends a written fee.