Fire Strategy Reports
Menu

Fire Strategy or Fire Risk Assessment: Which Is Being Asked For?

In one paragraph

A fire strategy explains how a building is designed to cope with a fire and is used to get it approved. A fire risk assessment looks at how an occupied building is being run and is a legal duty under the Fire Safety Order. The assessment relies on the strategy, which is why owners with no strategy often get asked for one.

People mix these two up all the time, including the people asking for them. If someone has asked you for “a fire report”, it is worth finding out which of the two they mean before paying for either.

The fire strategy

A fire strategy belongs to the building’s design. A fire engineer writes it to show building control, or the Building Safety Regulator, that the building meets Part B of the Building Regulations. It covers the fixed things: escape routes and stairs, the walls and floors that hold fire back, the alarm and sprinklers, smoke control, and how firefighters get in.

It is written once, revised during design and construction, and handed to the building owner at the end. See our page on what a fire strategy report covers for the detail.

The fire risk assessment

A fire risk assessment belongs to the building in use. Under the Fire Safety Order the responsible person must make one for almost every non-domestic building and the common parts of blocks of flats, and keep it under review.

It looks at what is happening now: fire doors wedged open, rubbish on escape routes, alarm testing, staff training, who might need help to get out. It ends with an action plan.

Strategy and assessment compared

Fire strategy Fire risk assessment
When Design, construction, change of use Throughout the building’s use
Written by A fire engineer A fire risk assessor, or the responsible person
Required by Building control in practice, to show Part B is met The Fire Safety Order, as a legal duty
Focus How the building is designed to work How it is being run
Updated When the design changes Regularly, and after any significant change

Why an assessor asks for a strategy

An assessor checking a building needs to know what it was meant to do. Is this a stay-put block or a simultaneous evacuation one? Which doors are fire doors? Where are the compartment walls? Without a strategy they have to work it out from what they can see, and they may recommend one is written.

That is the most common reason owners commission a retrospective fire strategy. Our cost guide shows what one typically costs.

Sources

Fire strategy quotes for your project

Tell us where the site is and how to reach you. An engineer will ask about the building and the drawings when they call.

We look for one fire engineer suited to the scheme. You'll know who they are before they hear anything about you, and there's no charge from us.

Worth having to hand: the address, the use, the number of storeys and whichever drawings you hold.

The site and how to reach you
Get a quote