
Find a Fire Engineer
What separates a fire engineer you can put in front of building control from one you can't, and how we find one for your scheme.
Four things to check before you appoint
"Fire engineer" isn't a protected title. These are the checks that count.
Registration
Chartered (CEng) or incorporated (IEng) through the Engineering Council, usually by way of the Institution of Fire Engineers. Expect it for Gateway 2 work.
Membership
Membership grade of the Institution of Fire Engineers. Ask which grade the engineer holds and whether they are registered through it.
Insurance
Professional indemnity cover at a level that suits the scheme. Ask for the certificate, not just the figure.
Track record
Strategies on the same kind of building, and for tall residential work, applications the regulator has approved.
Where a fire engineering consultant's fee goes
Most fire engineering work on a project is writing and defending the fire strategy. The engineer reads the architect's drawings, decides which guidance applies, checks escape routes and fire separation, specifies what the alarm, sprinklers and smoke control need to do, and writes it up so building control or the Building Safety Regulator can approve it. On bigger schemes they also attend design meetings, answer the regulator's queries and check the work on site.
Where the design goes beyond the published guidance, a fire engineer earns their fee. Proving that a longer corridor or an open atrium is safe means calculation and often computer modelling of smoke and people moving. Engineers with that skill are scarcer and more expensive, so it is worth knowing early whether your design needs it. The fee calculator shows the difference it makes.
The questions worth asking
- Who will write the report, and who will check it?
- Which guidance or standard will the strategy follow, and why?
- How many rounds of comments from building control or the regulator are in the fee?
- Are the fire strategy drawings included, and in what format?
- Will you visit the site, and is that priced separately?
- How soon can you start, and how long will the first issue take from full drawings?
Matching the engineer to the stage
A planning fire statement, a Gateway 2 strategy and a handover pack all need different things. The first needs someone who understands planning and site layout. The second needs someone the regulator has seen before. The third needs someone methodical who will walk the building. Tell us the stage when the engineer calls, and see the pages below for what each one involves, including typical fees.
Fire strategy work by stage
- Planning fire statementWhen it is needed and what the engineer will ask for.
- Gateway 2 fire strategyWhen it is needed and what the engineer will ask for.
- Retrospective fire strategyWhen it is needed and what the engineer will ask for.
- Regulation 38 handoverWhen it is needed and what the engineer will ask for.
Questions about hiring a fire engineer
What does a fire engineer do?
They design and check how a building protects people in a fire: escape routes, compartments, smoke control, structure, and access for firefighters. On most projects the visible result is the fire strategy report, from the planning fire statement to the handover pack.
Is a fire engineer the same as a fire risk assessor?
Not always. Some do both, but fire risk assessment is a different discipline with its own registers. For design-stage strategies you want a fire engineer; for a building in use, an assessor.
Do fire engineering consultants work nationally?
Many do. Desk-based work such as a strategy from drawings can be done from anywhere, but a retrospective strategy or a pre-handover walk-round needs someone who can get to the site, so we look for an engineer who covers the area.
How do you choose which engineer to put forward?
We look at the building type, its height, the stage it is at and where the site is, and approach an engineer whose experience fits. How matching works explains the steps.
Find a fire engineer for your project
Tell us where the site is and how to reach you. An engineer will ask about the building and the drawings when they call.
We look for one fire engineer suited to the scheme. You'll know who they are before they hear anything about you, and there's no charge from us.
Worth having to hand: the address, the use, the number of storeys and whichever drawings you hold.
Enquiry received
- An engineer matched to the site and building type is emailed to you by name.
- Reply yes and your details go to them; reply no and the enquiry closes.
- The engineer calls, asks for the drawings and sends a written fee.