What Fire Strategy Drawings Show, and When Building Control Asks

In one paragraph

Fire strategy drawings are the architect's plans marked up by the fire engineer to show escape routes, fire-resisting walls and doors, compartments, alarm and smoke control, and how firefighters get in. Building control usually wants them with the strategy, and the building owner needs them at handover.

A written strategy explains how a building copes with a fire. The drawings show where. Most building control surveyors read the drawings first, and many owners never read anything else, so they deserve the same care as the report.

What goes on them

Fire strategy drawings start from the architect’s floor plans, and sometimes sections. The fire engineer then marks up, usually with a colour key:

  • Escape routes, with the direction of travel and the final exits
  • Travel distances, measured to the nearest protected stair or exit where they are close to the limit
  • Compartment walls and floors, and the fire resistance each needs in minutes
  • Fire doors, with their rating and whether they self-close
  • Protected stairs, lobbies and corridors
  • Alarm and detection zones, and the type of system
  • Smoke control: vents, shafts and fans
  • Sprinkler coverage, where there is any
  • Fire service access: where the appliance parks, the dry or wet riser inlets, the firefighting lift and shaft

A good set reads on its own. Someone who has never seen the report should be able to tell which doors matter and why.

When building control asks for them

For anything beyond a simple house extension, building control will usually ask for the drawings alongside the fire strategy report. Approved Document B sets out what has to be met; the drawings are the quickest way to show it has been met on each floor.

For higher-risk buildings the drawings form part of the Gateway 2 application to the Building Safety Regulator. Our Gateway 2 fire strategy page covers what else goes in.

Drawings at handover

The drawings issued for approval are rarely the drawings of what was built. Doors move, rooms are split, risers shift. At completion the engineer should update them to match, and they go to the building owner with the rest of the fire safety information that Regulation 38 requires.

Those as-built drawings are what a fire risk assessor uses for years afterwards. If they are wrong, every later assessment starts from a wrong picture.

Formats and who keeps them

Most engineers mark up PDFs of the architect’s plans. On larger projects the drawings may live in the building information model instead, with fire layers the engineer controls. Either way, ask:

  1. Are the drawings included in the fee, and how many revisions?
  2. Will you issue editable files or PDFs only?
  3. Who updates them after a change on site?

For older buildings with nothing on file, the engineer has to survey the building and draw plans before marking them up, which is part of a retrospective fire strategy. Our cost guide shows what that adds.

Sources

Fire strategy quotes for your project

Tell us where the site is and how to reach you. An engineer will ask about the building and the drawings when they call.

We look for one fire engineer suited to the scheme. You'll know who they are before they hear anything about you, and there's no charge from us.

Worth having to hand: the address, the use, the number of storeys and whichever drawings you hold.

The site and how to reach you
Get a quote