How Matching Works
Fire Strategy Reports puts clients in touch with fire engineers. It employs none and writes no strategies itself.
You send the postcode
Postcode of the site, then name, phone and email address. Nothing more.
We look for an engineer
One fire engineer whose experience fits the stage and the building, and who covers the area.
A matched engineer, by email
We email you who they are. Your details go to them only if you say yes.
They quote you directly
The engineer calls, reads the drawings and sends a written fee. Any contract is between you and them.
Who pays the introduction fee
You don't. The engineer pays us a fee for each introduction they accept. That fee never changes what they charge you, and you are free to get other quotes as well.
How we choose the engineer
We put forward an engineer whose work fits the stage of the project and the type of building, and who covers the site. We don't inspect their work or vouch for any individual report, so make your own checks before you appoint: our page on choosing a fire engineer lists the questions to ask.
Your enquiry data
We keep what you send for the time set out in our privacy notice, and we pass it to one engineer only once you agree. If you change your mind, tell us and we'll stop. To see what fees to expect before anyone calls, use the fee guide.
Fire strategy quotes for your project
Tell us where the site is and how to reach you. An engineer will ask about the building and the drawings when they call.
We look for one fire engineer suited to the scheme. You'll know who they are before they hear anything about you, and there's no charge from us.
Worth having to hand: the address, the use, the number of storeys and whichever drawings you hold.
Enquiry received
- An engineer matched to the site and building type is emailed to you by name.
- Reply yes and your details go to them; reply no and the enquiry closes.
- The engineer calls, asks for the drawings and sends a written fee.